Every project site runs on tight schedules and tighter safety protocols. When it comes to moving heavy materials quickly and securely, delays or inefficiencies aren’t just frustrating—they’re costly.
That’s why industry professionals across Australia turn to the SuperDeck® Loading Platform by Preston Hire.
Purpose-built for demanding environments, SuperDeck® is engineered to streamline material handling at height. It improves site safety, boosts productivity, and simplifies the logistics of multi-storey construction or high-volume loading work.
What Is the SuperDeck® Loading Platform?
The SuperDeck® Loading Platform is a retractable, multi-level loading system designed for fast, safe, and efficient material handling on high-rise and construction sites.
It’s built tough, rated for heavy loads, and engineered to speed up crane cycles by allowing materials to be loaded directly into building floors. With simple roll-in, roll-out operation and minimal setup time, it makes on-site logistics faster, safer, and more controlled.
Core Features & Benefits
Ready to streamline your site logistics?
Contact Preston Hire Australia now at 1800 440 550 to hire a SuperDeck® and see the difference on your next project.
SERVICES
SAFETY
About
NEWS
Our branches will be closed 23rd December 2020 – 4th January 2021, however should you need equipment during this time we have staff and gear ready to go.
Please contact us on 1800 440 500 so we can quickly assist.
Have a safe, festive and relaxing break!